Wtat is mean by GHOAST VOLTAGE?

Answers were Sorted based on User's Feedback



Wtat is mean by GHOAST VOLTAGE?..

Answer / meenakshi

Stray or ghost voltages occur from capacitive coupling,
which takes place between energized circuits and non-
energized non-connected adjacent wiring.
practical occurance : When facilities or buildings are
built and wired, it's very common for the electricians to
pull extra wire thru the conduit for future use. These
wires are typically left unconnected until needed.at this
situation coupling effect takes place as explained above.

Is This Answer Correct ?    3 Yes 0 No

Wtat is mean by GHOAST VOLTAGE?..

Answer / anoop

Ghost voltage is the voltage which is occurred due to the
long length of cable (upto 400 mtrs) which generates
induction in the cable. Suppose we use a 16 c X 2.5 Sqmm
cable at a distance of 430 mtrs there will a induction in
ideal cores of cable due to long length of cable. Which is
called the ghost voltage.

Is This Answer Correct ?    0 Yes 0 No

Wtat is mean by GHOAST VOLTAGE?..

Answer / heena

it use to calculate net electric field as well as potential..

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

What are armoured cables?

2 Answers   IOCL,


How are load losses and no-load losses measured at site in a DG set?

1 Answers  


why voltages are multiple of 11 or 1.1???describe with derivation plzzz.thanks

2 Answers  


What is the difference between MCCB and MCB ?

4 Answers   Siemens,


A distribution transformer giving afrequency of 200HZ, where it is rated for 50HZ. when it will occure?

2 Answers  


why+ve is earthed in electrostatic precipitator in thermal power plant

0 Answers  


WHAT IS THE USE OF STARTER AND CHOKE IN TUBE LIGHT?

1 Answers   Siemens,


comparision between ACB and VCB

1 Answers   Lupin,


In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.

1 Answers   HAL,


How a band pass filter is constructed?

1 Answers  


Is a current transformer step up or step down ?

2 Answers  


circuit diagram of ht panel

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)