2.5mva transformer is installed in our company with oltc
but it is not working in auto mode ,it is operative in
manual mode control wiring is done how can i rectify it?
Answers were Sorted based on User's Feedback
Answer / s. venkateswararao
check the selector switch auto mode comand, and auto tap
changer time setting lower and upper voltage level setings
to be checked.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / naveen
Oltc worked with reverse- forward motor starter through in built programmed pcb card ,command taken from this card as per voltage observation whether voltage level to be raised or down .Voltage level can be also manually controlled via selector switch.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / guest
I feel its better to call in the experts. Like when I
worked at Reliance, the transformer was supplied by Bharat
Bijlee and their person used to come and do the needful
from Kalwa, Mumbai. Its quite complicated and not easy. So
you are advised to consult your supplier.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / ams
check AVR setting and check whether AVR is executing the
command correctly.If yes go for further check.
| Is This Answer Correct ? | 0 Yes | 2 No |
Once you can try changing phase sequence of tap changing
motor.
| Is This Answer Correct ? | 0 Yes | 4 No |
What is self exciting?
which of the following can produce maximum induced voltage..... (a)1amp dc current (b)50amp dc current (c) 1amp 60 cycle ac current (d)1amp 490 cycle ac current.
can we use trip light with bus coupler?
the distance from my office to d.g is aprox 400mtrs and voltage drops ibn my office near about 40 volt what should i do p[ls suggest.
we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?
what is dyn 11
how electrical earthing maintenance done in industry?
What is the min and max ohmic value for earthing?
1.why are not using acb 33kv ht side? is there any problem 2.what is difference between acb,vcb,sf6 breackers? 3.what is the function of invertor and convertor in ups?
How does a system control centre in a utility plant gets the grid frequency of the electrical network (50 Hz or 60 Hz)by the SCADA system?
what is the benift of HT metering & LT metering
How would you relate your key competencies to this position?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)