WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?..

Answer / arjun maini

it depends upon the site. In Low rise building construction brick is economical whereas in high rise building construction blocks are convenient as material shifting and load are reduced. Moreover blocks are soundproof as compared to bricks.

Is This Answer Correct ?    1 Yes 0 No

WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?..

Answer / yogesh anbhule

BRICK CONSTRUCTION

Is This Answer Correct ?    6 Yes 6 No

WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?..

Answer / engr ejaz

Brick construction

Is This Answer Correct ?    6 Yes 6 No

WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?..

Answer / arshad

Brick construction is economical, because it is cheap in availablity, localy available, & it is manufactured in less time compared to solid blocks, hence brick construction is economical.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

what is the concrete mix design ratio of railway sleeper??????

1 Answers   DSC,


What is bending moment?

1 Answers  


what is steel

3 Answers  


what is density of flyash?

5 Answers   ACS,


What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?

49 Answers   ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,


What is the procedure of Waterproofing in toilet sunken area ?

2 Answers   ACIL,


how many area req.in 15000liter water tank

7 Answers  


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

1 Answers   First American Corporation, GS Infra, L&T, Real Sociedad,


this is jagdesh from vizag, IM GOING 2 ATTEND BHEL interview on 14th dec. im a civil engg. graduate. plzz let me know the pattern & few questions of the interview if possible. plz reply at jd_marc@yahoo.com

0 Answers  


which oil is used for mivan shuttering?

3 Answers  


What is mean concrete class c35/20. Here C35 and 20 means?

10 Answers  


Mention what are the composition of a landfill?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)