how to calculate sand in CFT from a concrete foundation
(m^3)???
any book or article on pumped concrete.
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is Dewatering ?
24. Why should we hire you?
Rate analysis of Vitrified tile in cement mortor 1:3
0 Answers Design Space, Muthoot Group,
why we use 19x9x9and 20x10x10 but not other
How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
Why should appointment store person for project ? what is the benefits for company ?
How to calculate material and labor required for 100 m2 plaster?
what is the coefficient for running feet to cft coversion both area and price
design mix for M15,M20, M25,M30 please
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)