Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


High voltage test procedure of in swgr board.
why should measure millivolt drop on testing time?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

How to see the inductance in a transmission lines

0 Answers  


why aggregate is placed all around substation ground.

1 Answers  


Can we use BS 6651 and BS EN 62305 standards for computer room lightning ptotection in substation?

0 Answers   Jindal,


in railways why we use the power in 10,20 30kv,why not in the multiple of 11kv

2 Answers  


sir, my question is that if we start any three phase induction motor with star connection.will be current taken ? please send a formula.

4 Answers   ABB,


What is the RME and explain the full form and what is the RME work?

0 Answers   JLL,


In CDG type IDMTL realy O/L , E/F, O/C which are used for out going feedrs,on R-phase o/c element, Y-phase , e/f elecment and on b -phase o/c element will be connected . Why the earth fault on center phase only, why not on other two phases?

2 Answers  


How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?

0 Answers   Oberoi,


why needtwo winding LV and HV in transformer?

1 Answers   Organic Industries,


what is the operation of Control Module(CM),MONITOR Module(MM), MONITOR Module DUAL (MM2),Signal Module(SM),Isolator Module(IM), please some one reply me.. the operation and application of these in FIRE ALARM SYSTEMS...

1 Answers  


Inductor and capacitor ........ power in one phase and ...... it in another phase. if any body found this gaps answer.please sent me to habib_eu2008@yahoo.com

2 Answers  


What core magnetic balance test of transformer? How to do this test in a three phase Star delta (star-LV, Delta-HV) transformer? How to measure and where to measure? thanks and regards Austin

22 Answers   Neutech, Power Grid, TSSPDCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)