Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much steel required in 1 square feet slab?

Answer Posted / waseem khattak

you can only assume or can calculate from structure drawing
normaly 30 ton steel required for 1 kanal plot with basement
and rcc wall

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can explode a block?

1168


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2579


how water proof chemicals act in concrete to avoid leek?

2293


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2577


What are the skills required to become an architect?

1099


Formula of area of crane hook

2077


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

2194


How to estabilish reinforcement Steel rolling margin for a building projects ?

4229


Define What is the tensile strength of wood?

1171


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3677


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1632


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2395


How can i do RCC rate analysis?

1732


What is the difference between engineering stress and true stress?

1263


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2914