Answer / Seema Gupta
The design of a PCC (Portland Cement Concrete) road involves several factors, and it's essential to refer to the relevant local design guidelines or specifications for accurate information. However, I can provide you with some general principles:n
1. Thickness of Pavement:n- The thickness of a PCC pavement for a load of 30 kN (assuming VR standard and M30 grade concrete) depends on factors such as traffic volume, axle loads, and subgrade condition.n- Typical thicknesses range from 15 cm to 20 cm or more for heavy traffic areas.n
2. Width of Pavement:n- The width of the pavement (4 meters in your case) is typically determined by design standards and does not affect the thickness calculation directly.n
3. Length of Panel:n- The length of a PCC panel depends on factors like construction equipment availability, concrete strength development, and joint spacing requirements.
| Is This Answer Correct ? | 0 Yes | 0 No |
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
if water absorption is more than 25 percent in brick, what is the defect in it?
As shown in IS 456-2000 minimum cement content is include fly ash?
it is possiblee to produce concrete with out cracks...
How to calculate cement qty of M10, m20, m25 ? I got the formula but I lost it.
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
how to decide the column size and dia of the bar
which has high compressive strength between hollow block and brick masonry?
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
In concrete mix, water is required . we tried in case of water we are used milk. what hapened
what is quantity of sand required to plaster wall about 1000 sq ft
What is labor and material payment bond?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)