adspace
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30
KN. what should be thickness of pavement, width 4m what
should be length of panel.
Answer Posted / Seema Gupta
The design of a PCC (Portland Cement Concrete) road involves several factors, and it's essential to refer to the relevant local design guidelines or specifications for accurate information. However, I can provide you with some general principles:n
1. Thickness of Pavement:n- The thickness of a PCC pavement for a load of 30 kN (assuming VR standard and M30 grade concrete) depends on factors such as traffic volume, axle loads, and subgrade condition.n- Typical thicknesses range from 15 cm to 20 cm or more for heavy traffic areas.n
2. Width of Pavement:n- The width of the pavement (4 meters in your case) is typically determined by design standards and does not affect the thickness calculation directly.n
3. Length of Panel:n- The length of a PCC panel depends on factors like construction equipment availability, concrete strength development, and joint spacing requirements.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
please send me bhel questions on rupesh.017@rediffmail.com
what is the 0 value in quantity surveying
VAT and CST ? Which benefits for buyer ? Why benefits?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
HOw much % of premium on DSR-2013 currently
Which is the latest version of solidsworks?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the difference between replacement of cement by groundnut shell ash
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com