what is quantity of sand required to plaster wall about
1000 sq ft
Answer / v ramesh
area in m^2 = (1000/10.76)=92.95sqm..
volume=92.95X(12/1000) = 1.12M^3
add 30 t0 35% of bulking of sand= 0.336M^3
add 20% for wastage of sand = 0.224M^3
total = 1.68M^3
=(1.68/(1+4)) = 0.336m^3
=cement = 0.336*30=11 bags
= sand = 0.036*4 = 1.344M^3 of sand
| Is This Answer Correct ? | 1 Yes | 0 No |
M.C.Q
3 Answers Mitsui OSK Lines, TechInfini,
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Explain the different types of roofing systems?
what is lap length? why it is required?
Differenciate between One way slab and two way slab
pls give me ans to ACT formula cube testing porpuse
What is 1/8 on the architect ruler denotes?
practically where this hinge and roller condition used
How to do lineout of building
wat is the size of fine aggregate & coarse aggregate?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)