what is quantity of sand required to plaster wall about
1000 sq ft
Answer / v ramesh
area in m^2 = (1000/10.76)=92.95sqm..
volume=92.95X(12/1000) = 1.12M^3
add 30 t0 35% of bulking of sand= 0.336M^3
add 20% for wastage of sand = 0.224M^3
total = 1.68M^3
=(1.68/(1+4)) = 0.336m^3
=cement = 0.336*30=11 bags
= sand = 0.036*4 = 1.344M^3 of sand
| Is This Answer Correct ? | 1 Yes | 0 No |
what is mean by eccentric footing?
U are a civil engineering student?why do u want to enter into IT industry
What is the IS code of Rcc & PCC
What is the meaning of unit weight of cement?
what is bond strength .
Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
what is the weight of concrete for 1 cum?
15 Answers Dhenu Infrastructure, L&T,
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
Wats the purpose of lap length? Is it for strength or increasing of span
How can i display 5 asterisk and another 5 asterisk )?
calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio
if i want to change the dia of some bar in a structure,then which formula should be used to find the spacing for the bar of new dia?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)