how to decide the column size and dia of the bar
Answers were Sorted based on User's Feedback
how many shuttering material required for 1000 sq.m built up area.
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
In two way slab where should we stop the work at end of the day?
what is the formula for lapping length
How can we improve the capacity of a existing foundation?
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
Dear Sir What is the Contraction joint for base Slab
how to calculate steel in slabs ?
DEFINE M30 GRADE CONCRETE. FROM THIS QUESTION WHAT; "M" & 30?
7 Answers Descon, Northstar Homes,
How do you determine or evaluate success?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
calculate if the size of the beam is 300*500 then L for the top & bottom bar