why is the vector group analysis done in transformer tests
Answers were Sorted based on User's Feedback
Answer / ganeswar sahu
To check the phase angle displacement between two
windings of a manufactured traformer and to check whether
internal winding connection is matching to the vector group
as mentioned in the name plate .
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / raju.t
1. To check the phase angle displacement between two
windings of a manufactured trafo.
2. To check the correctness of vector group mentioned in
the name plate of trafo and actual connection.
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / jagdish krushnarao zeliye
vector group of transformer is used to know the phase angle
for parallelling operation
| Is This Answer Correct ? | 13 Yes | 5 No |
Answer / saba anjum
vector group are made to know at what position the secondary
winding of transformer we get star and delta voltages . and
it indicates the type of winding in primary and secondary
which helps in parallel operation of transformer with
different ratings having same vector group .
| Is This Answer Correct ? | 13 Yes | 7 No |
Answer / purav solanki.
for the parallel operation of two transformer.
| Is This Answer Correct ? | 13 Yes | 8 No |
Answer / usama badran ali
vector group analysis used for two important things?
1-it describes the charcteristic of transformers...how?
1-primary and secondary connections.
2-low and high voltage sides.
3-leading angle between high and low voltages.
2-to connect two parallel transformer, you should know the
line to line voltages of two transformer (i mean each
similar line voltages of the parallel transformers ).
3-in the modern technolgy of power electronics in three
phase inverters i can eleminate fixed order of harmonics by
changing the transformer connection .
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / saksh
to check the phase angle displadement so as to know the
power factor itis lag or lead
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / kulu
TO Check the phase displacement between HV winding and Lv
winding
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ramama
for parallel operation of two different rating transformers
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ganesh nayak
Vector anlysis is done to check whether the transformer
under test is suitable for parallel operation with another
transfomer having same vector group and voltage ratio but
difference in KVA rating.And to know the phase displacment
and polarity of the transformer.
| Is This Answer Correct ? | 2 Yes | 1 No |
can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)
Why the earth to phase voltage is high 250 compare to other two phases
derive the e.m.f equation of transformer
how fault in an electric system is detected & hw protection of equipments is done ?
how to differentiate a mpcb,mcb with a contactor? Explain their working operation
In what voltage EHT works(133/132/33/66kv?
why bulbs when connected in series glow dim
tube light how its working.,?
what is DRP panels?
What is Meter MF if External CT Ratio is 150/1 , PT Ratio is 132/110 Meter CT Ratio is 200/1 & Meter PT Ratio is 110/1
What is done to avoid interference of high frequency transmission lines with communication lines??
Explain role of Buckolz Relay in Transformer ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)