why is the vector group analysis done in transformer tests
Answer Posted / ganeswar sahu
To check the phase angle displacement between two
windings of a manufactured traformer and to check whether
internal winding connection is matching to the vector group
as mentioned in the name plate .
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
PLZ EXPLAIN THE INTERLOCKING AND CONTROLLING OF CONTACTORS????HOW CAN I DO THAT?
Tell me about ur past electrical maintanence job
Define noise?
Importance of fault current in power transformers and how to monitor the same? How is it different from winding temperature?
How stabilizer works??
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
Why synchronous motor is used in power factor improvement,dc series in lift
Explain about c.t?
HOW TO CALCULATE THE VT SIZING?
where solid grounding and where grounding through ngr done and why?
hi i will D.E.E.E.is completed pls send rrb diploma old qustion papaer sent in my e mail. i.d.
How to Calculate The Neutral Earth flat design calculation for the Synchronised generator (Gen 1-650Kva, Gen 2-725Kva
75 kw motor take 45 amp in no load delta in star 10 amp but in load it will take 160 amp but IR velue of winding above 500 at 1kw ph to earth and ph to ph. what problem it should be?
whether fibre optic cable in high voltage earth conductor is used for protection circuits
working principles of cf lamp,incandescentlamp and f lamp?