1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate
how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculation
34 Answers Call Centre, CCCL, Oracle, RLM, RPP, Sunanda Infra, Sunrise Enterprises,
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
Whta is the proportion of M30
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
in 100 cft = 1350 bricks in 100 cft = ? bloks
What is the difference between undo & redo?
what is meant by belt in house construction?
Tell me about triple point of water.
What are the different grades of concrete & their ratios?
In the roof of a pumping station explain briefly the components of a waterproofing system?
the coefficient of curvature for a well graded soil must be inthe guage 0.5-1 3-4 4-5 none