1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
Answer Posted / wicked_dipen
plz ny1 help me in finding this answer
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How much is the cover for slab?
What will be weight of 0.5mm GI sheet per sq.ft?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
how meny typs of renging rod?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Explain moment of inertia?
how many spacers we need for 1 ton reinforcement? aprox.
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
what is the clear cover for shearwall?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is the development length given in pile?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area