1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
Answer Posted / wicked_dipen
plz ny1 help me in finding this answer
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
States some of the commonly used commands in cad software’s?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Explain what is 1/8 on the architect ruler denotes?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What was asked in isro civil interview
Reinforcement details at hinged joint
Which is the latest version of solidsworks?
How can you distinguish between sorption, absorption and adsorption?
How to do bbs in excel format
Define What is the force exerted by the Tacoma narrows bridge?
why do we not deduct volume of steel to find actual volume of concrete in practical???
water leak detection system question & answer
what is constat for brickwork
what is civil engineer greatest strength and weakness?
what is the water cement ratio for plastering