what is the stripping time of beam?
Answers were Sorted based on User's Feedback
As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days
| Is This Answer Correct ? | 11 Yes | 2 No |
Answer / yisahak
Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sourish
Stripline is a beam diagnostics device used to measure beam
position/phase in particle accelerators.
| Is This Answer Correct ? | 1 Yes | 3 No |
Stringer How many cm goes to landind
one cricket ball through in chennai and jaipur same speed where bowl has fast speed
What is the purpose of the gap in the road on this bridge?
How many BRICKS required for 10 cumic of brickwork
What is the acceptance criteria to determine the "Core density" of "DBM or BC" course,for any grade as per "MORTH" guidelines in road construction work ?
Sand density
how to calculate the density of cement and how can we convert no. of Kgs of cement to Metric tonnes??
What is the construction cost per sq foot for residential building and give bifurcation of same?
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
Explain different types of rcc pipes.
Trapezoidal section footing calculation of Volume & its Area
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)