If the output of a 100kva, 415v generator is stepped up to
11kv with a 500kva transformer,can the transformer be
Loaded above the source generator loading?
Answers were Sorted based on User's Feedback
Answer / m.aqeel
no main thing is ur source so our system can bear only
source rated power.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / kushal parikh
Transformer can be loaded upto 5 times as generating source is 100kVA and transformer is of 500kVA. Other source can be added by putting it on same bus.
Let me know if i'm wrong.
Is This Answer Correct ? | 0 Yes | 0 No |
Define cut-off rate?
What is CBCT ,why and whereit is used?
Sir, I need a power supply at 380V. The supply I get in three phase is rated 415V. The total supply I have from the supply company is 70KW. Kindly inform if it is better to use a voltage stabiliser for this purpose or a transformer
What does CDG,CDAG,CAG,VAJ,VAJH,VTT,VAZ,VAA etc. stands for in case of relays and can anyone answer to decode this codes C,V,D,G,A,X,TT,J,JH etc
Is there any reason that we get shock on touching phase wire because the earth is at neutral potential? Is there any reason that the earth is at neutral potential because the neutral is earthed in apower station
What are the main parts of VCB?
what is the working principle of induction motor
which is chemical used as in ro water what is difference betweeen multi grade filter&dual media filter
In a 3 pin plug holder, what is the purpose of diameter of ground pin is larger than phase and nutral pin
How ships are protected from lightning?
What is auto changeover and how it works plz write details.
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?