Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate the electrical load for a standard telecom
BTS shelter and capacity of DG set required to cater to
this load?

Answers were Sorted based on User's Feedback



How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set req..

Answer / gkg

For Active load,voltage will be 48vdc or 24vdc,
so total active load=48v x 28A =1344w =1.34kw

passive load calc ok.

Is This Answer Correct ?    51 Yes 10 No

How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set req..

Answer / chandrashekar

Generally in telecom shelter only Passive and Activie load
will be available.
Passive loads are battery bank, PIU and Power plant. and In
active loads Concern BTS and Transmission load.

Thumb rule to calculate DG rating is KW=KVA*PF(0.8) or
Efficiency

i.e KVA=KW/PF


Example to calculate the rating of DG.

If total Load is available 15Kw both active and Passive
then

we should apply above formula KW=KVA*0.8

15=KVA*0.8 KVA = 15/0.8=18.75KVA
we can consider nearest rating of DG i.e=20KVA








Active Load Calculation:

Say a shelter is having only 1nos of BTS,Each BTS will
consume 20A to 30A load current depends up on type and make
of the BTS. average if we take 25A.
Transmission load for each BTS is about 3A total
transmission load current is 3A.
Now the Total Active Load current is =25+3=28A

Total Active load is P=VI P=230*28=6.4KW

Passive Load Calculation
1) AC Unit 2tr 1No the load is =7KW
2) All Internal Lighting and other =1KW
total passive load is 8KW now the toatl active and passive
load is =6.4+7+1= 14.4 KW round off 15KW.
for 15KW load 20KVA Dg set is sufficient

NOTE: always we should consider 1.5% extra rating because
starting current will always 1.5 % higher than load current.

Is This Answer Correct ?    56 Yes 25 No

How to calculate the electrical load for a standard telecom BTS shelter and capacity of DG set req..

Answer / dhananjay vats

VXI(BTS LOAD)=W/1000=KW.....A
8% LOAD LOSSES IN KW.........B
10% B.B CHARGING LOAD (EX-600AH, 60AX54V/1000)....C
INCOMING LOAD IN KW....C
AC IN KW (EX-1TR, 1TR-1350W, 1.3KW)......D
TOTAL ADD IN KW=A+B+C+D.....CONNECTION EB IN KW
KW=KVA/P.F

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

If the capacitor bank is installed in switchyard say 132/22kv then on LT side say 22kv/0.433kv is it necessary to install capacitor bank for maintaining power factor. if pf is maintained on HT side then will that be maintained on LT side as well.if not then how&why??????/ please explain...........

3 Answers   MacLellan,


I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?

0 Answers  


Kindly Tell me name of the book for electrical estimation and costing ,calculation or web site to download

1 Answers   ABB,


Transmission line design. Say, I have a 1MVA generator and 2 transformers that will have the same load. What would be the proper rating of the trasformers? Is it safe to say, that I will simply divide the total rating of the generator?

1 Answers  


Why LT cables are not sized based on short circuit capacity.

3 Answers  


What is meant by earthhing of a magnetic flow meter and when to use empty pipe detection?

0 Answers  


how does an open delta transformer works

2 Answers  


what is the AC Plant and how can do the work with parts and picture tell us 150 Tr

0 Answers   Wipro,


What is load boxes ?

0 Answers   AMIE, PEPL,


Can we connect two or more energy meters/Amp meters on one CT set(Three phase).

5 Answers   Parle, Watermark Engineering,


How many gap between finger contact in a.c.b. and v.cb.?

0 Answers  


In a overhead system why the voltage between line &ground is taken for basic comparison ?and in case of underground cables the comparison take only by the voltage between cables?

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)