Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If we know the N - Value of soil and required bearing
capacity how do we know what diameter and length of pile to
be casted?
How can we check whether the dia. and lenght of pile we
have selected are most economical onse?

Answers were Sorted based on User's Feedback



If we know the N - Value of soil and required bearing capacity how do we know what diameter and le..

Answer / dushyant bansal

Mr. Sandip Sawant
U r nuts and
U dont know any thing about piling and engineering
This was the worst answere any body can claim for the
question mentioned

Is This Answer Correct ?    6 Yes 1 No

If we know the N - Value of soil and required bearing capacity how do we know what diameter and le..

Answer / sard

First of all
If N values are available , lot of correlations are
available to find out the angle of internal resistance
Now from angle of internal resistance find out the pile
capacity using static formula

Now if pile capacity is more than the much more than the
factored stress acting over the pile cap . its uneconomical

Is This Answer Correct ?    2 Yes 1 No

If we know the N - Value of soil and required bearing capacity how do we know what diameter and le..

Answer / sandipsawant36

300MM

Is This Answer Correct ?    0 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

how many lab test on bricks and aggregate write briefly please

2 Answers   NPC, Omaxe,


which is the period is known as golden period in ancient india?

1 Answers   RRB,


Define What is unit weight of normal concrete?

0 Answers  


what is the purpose of laying PCC?

17 Answers  


calculate for 1 m3 cement, sand, coarse agree gate ,kg?

4 Answers  


 Describe a time when you anticipated potential problems and developed Preventive measures

0 Answers   Graham Construction,


What is Time period of a building and its relation with frequency ?

0 Answers  


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

0 Answers   BBCL,


deshuttering time for RCC for DPC over the foundation.

4 Answers  


What is fineness modulus ? and its sieve # ?

0 Answers  


among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????

3 Answers  


For a washout valve why are two gate valves required in normal practice?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)