If we know the N - Value of soil and required bearing
capacity how do we know what diameter and length of pile to
be casted?
How can we check whether the dia. and lenght of pile we
have selected are most economical onse?
Answer Posted / dushyant bansal
Mr. Sandip Sawant
U r nuts and
U dont know any thing about piling and engineering
This was the worst answere any body can claim for the
question mentioned
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is fineness modulus ? and its sieve # ?
what is civil enginnering & what you need of this course?
how to calculate MR 9(derivation)
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What are the causes of building collapse?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
explain the rale of the government in the construction industry
What are the responsibilities of a construction manager?
what values & beliefs have guided you in your career path
How to calculate the load of partion in flat slab if we use brick?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is meant by autocad?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
at what pressure ply-wood is obtained by gluing wooden sheets