Can i connect all earth pits in ring system...,
And wat IS 3043 says...please help me
Answer / manikandan
According to IS 3043 earthing pits can be connected together
but the Lightning arr ester , Transformer neutral should
not be connected together since there will be restriking
faults frequently.
Is This Answer Correct ? | 1 Yes | 1 No |
If 11 KV breaker on the primary side of a 11 KV/3.3 KV 12.5 MVA transformer can be installed at a distance of 1000 mtrs through a 11 KV cable. If no what are the probable reasons.
How line capacitance & line inductance varies with increase in height tower.
we touch other end of the tester supply, why do not get shock?
How we can come to know the substation range,without go through any name plate ?
If I want to buy a new Xformer for my plant what are the main parameter will I need to check?
What is inverse definite minimum time lag relay? Where is it use?
how technical is calculated in 11kv line and lt line
what is relation between vector group of transformer and its load hormonics?
how desiel generate sart fail of eb?
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
what is size of 3phase 4wire cable to be used for 11 ton ductable A.C and how to calculate cable size for different load
What are conduct on the testing in cf in ur site?