Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Do these factors (settling time, peak time, steady state
error, overshoot, rise time, MPOS (Maximum percent over
shoot)) are the part of first order, second order, higher
order, linear, non-linear, open-loop, closed-loop,
homogeneous & non-homogeneous systems ?



Do these factors (settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum..

Answer / saasa

yes,igot ur point..

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why there are semi conductor layers on conductor and XLPE insulation of HT cables

1 Answers  


why PT Primary are the grounded?

5 Answers   L&T,


how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 1993.WORKING IN PVT COCERN LT LINE.PLEASE ADVISE ME .CELL NO 9994786021

0 Answers  


how power saving takes place through VFD?

9 Answers  


How the real power output is controlled in a Generator?

2 Answers  


What is the function of isolater

4 Answers   Getco, Gland Pharma,


what is the installation process for lifts

0 Answers   DLF,


sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.

0 Answers  


Why is it not possible to operate a star-delta transformer in parallel with delta-delta transformer?

1 Answers  


What is meant by RVT and NDR ? expansion and details of it

0 Answers  


wht factor are considered to design ACB( air Circuit reaker) 415V

3 Answers  


which one is dangerous AC Power r DC Power for Electrical Shock ?

10 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)