What happen when change order of CT in GIS feeder?



What happen when change order of CT in GIS feeder?..

Answer / Sohan

Changing the order of current transformers (CT) in a Gas Insulated Substation (GIS) feeder can lead to incorrect phase measurements and unbalanced load calculations. It may also affect the protective relay settings, which could potentially compromise the overall system stability and protection.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

only three phases are coming in step down tranformers.how to get neutral?

5 Answers  


we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.

4 Answers  


whose motors self starting synchronous or Induction motor?give fact reason why not self starting another mother

2 Answers  


exact difference between electronicsand electrical

5 Answers  


What is IGBT?Where it is used? What is the difference between IGBT and Thyristor?

5 Answers   AC, Formo Plastic, HBL Power Systems, SECL,


How to increase home power factor? Can we connect capacitor directly? How to select capacity of capacitor?

5 Answers  


what is the difference between RMS meter and normal meter

3 Answers   TATA,


why the energy meter disc rotates anticlockwise while reading

1 Answers   KSEB,


Why the CT Secondary is rated as 5A generally?

2 Answers  


How many 2 ton window A/c can runs on a 125 KVA generator?

3 Answers  


How does the sensitive earth fault protection provided by cbct for motor can help in reducing the size of cable used to supply the motor?

1 Answers  


why different series of vfds (like allenbradley)are used in industry ?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)