what is difference between fe 415 and fe 500

Answer Posted / benarji

fe is called ferros it is steel

415,500 is the yield stength of the bar

so these both defference is only the strength.

Is This Answer Correct ?    114 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

silt%= silt volume/ silt+sand volume is this right?

1504


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

1630


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1765


why is M30 grade Concrete use for Foothing & Column M50

2983


What is the release of lien?

693






How is make concrete cube?

702


What is meant by engineering drawing?

658


How to calculate paint drums per meter square

2016


trapozidal

2005


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1034


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

662


five benefits of using standard terminology in the measurement process

2858


what does the track parameter mean in staad.pro?

5455


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

1724


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1675