what is difference between fe 415 and fe 500
Answer Posted / benarji
fe is called ferros it is steel
415,500 is the yield stength of the bar
so these both defference is only the strength.
Is This Answer Correct ? | 114 Yes | 8 No |
Post New Answer View All Answers
silt%= silt volume/ silt+sand volume is this right?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
why is M30 grade Concrete use for Foothing & Column M50
What is the release of lien?
How is make concrete cube?
What is meant by engineering drawing?
How to calculate paint drums per meter square
trapozidal
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
five benefits of using standard terminology in the measurement process
what does the track parameter mean in staad.pro?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?