what is RPI and NUT in controlnet networx. what happen if
we are increase the NUT of controlnet networx?
Answer / arjun chauhan
RPI-REQUEST PACKET INTERVAL
NUT- NETWORK UPDATE TIME
RPI SHOULD BE GREATER THAN NUT LETS SAY RPI=20MS AND NUT
=10MS BECAUSE FOR EACH REQUEST EXECUTION NETWORK SHOULD BE
UPDATED FIRST
GOOD LUCK
| Is This Answer Correct ? | 8 Yes | 2 No |
what is instrumentation?
What is wet leg condition and why is it used?
Is an analogue only transmitter as accurate as a smart transmitter?
what is the meaning of GK value(fullform) in flowmeter ?
Dear all, I'm manikandan I have done by DIPLOMA EEE from 2011 , I have 5 years of experience from Power plants instrumentation field , which one field is give long life & which one field is best ,I confused a lot And also I'm studying AMIE, can I choose which field from Section B examination?
what is the deferance between LCN and UCN.
What is the differace between Volumatric flow meter and Mass flow meter.
What is the standard height for stancion supports? and what is the standard mounting height for different transmitters?
how u measure dp in dp tx? how u calibrate a dp tx?
How to calibrate H2s Dectector
Hello friends i need check lists of different instruments during the Erection and commissioning in thermal power plant.Please help me.My Mail id is naba02222@gmail.com/naba02222@rediffmail.com Thanks Nabakishore Biswal
Isometric drawings are generated during _________________ phase of a project
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)