the construction of building in that primary thing is dig
the soil which what depth will dig in stiff soil
how much binding wire is reqd for 1 MT
DO YOU HAVE REFERENCE LIST?
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
How to calculate per inch area in a circle?(Dia is 2.17m)
Can fly ash bricks can be used in brick bat coba?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
who to calculate the bar bending schedule?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
i need the how much materials are needed for cubic feet of concrete?
how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)