Is ground earthing required for neutral conductor of a
prime mover ie DG set?
Answer / vsrkvsrk
Earthing of neutral conductor is only reuired for 3 phase
supply. It is not required for single phase supply supplied
by DG sets.
| Is This Answer Correct ? | 9 Yes | 4 No |
What is the purpose of earthing Truck ? How does it work for busbar and cables?
what is meant by power factor ?
IN A SMALL D.C GENERATOR, IF WE REPLACE THE LAMINATED CORE ARMATURE WITH A WOODEN BLOCK OF SAME SIZE & SHAPE AND WIND WIRES WOUND ON THE SLOTS OF WOODEN ARMATURE AND CONNECTED TO THE COMMUTATOR.COMMUTATOR IS FITTED WITH BRUSH TO RECEIVE INDUCED E.M.F.WHETHER E.M.F GENERATED OR NOT?
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
why transformer rating is given in kva?
which one is rotating transformer-single phase induction motor or 3 phase squirrel cage motor?
The power supplied to a 50mH inductor from a 120V, 60Hz source will be
what isthe emf eqation of a transformer
What is disc insulator and it's application..?
what are the reasons of CT circuit faulty in busbar protection scheme?
Plz tell me how we can find that particular company has vacancy or not
for a 5hp motor to operate from 100kva generator ,what size of cable required in sqmm.
2 Answers DSC, Indraprastha Gas Limited IGL, UltraTech,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)