our factory is going under construction mean time
transformer 1000 kva 2 nos &load break swithch 12 kv & 4
nos 750 kva 2 nos & 380 kva 2 nos
generator to be errcted.how to arrange earth pits &how to
earth connect & neutral pit how to calculate in earth bit
size.
No Answer is Posted For this Question
Be the First to Post Answer
which type of motor complete it's one rotation in 30 day's.
i want to do a project on PLC.... please give me an idea.....
why inductancce of armature inductance of dc machines is neglected?
what is circulating current in parallel transformer???plus how it is generated ???plz explain in detail.........
how you will decide the distance between the power transformer and its fencing
what is bus pt and what is the function of it ???
30 kva ups may kitne output voltage hote h
In which connection the voltage will be more , in star or delta connected motor?
role of shunt coil in circuit breakers
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
how to calculate full load current of transformer & induction moter ?
what is the difference between MCCB and SFU in terms of their application?
2 Answers Secure Meters, Tata Teleservices,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)