if u have to run a 300kw moter then what is ur choice HT or
LT switchgear & explain why?
Answers were Sorted based on User's Feedback
Answer / vinoth
For 300 KW motor we can use LT switchgear. Current consumption of a 300KW motor will mot be more than 1000A. So LT switch gear is possible to use
| Is This Answer Correct ? | 8 Yes | 3 No |
Answer / muralidaran - itc
It depends on Application. In HT conductor sizes will be
less & also motor will be more compact since current flow
will be less, but insulation level be more.
HT will be my choice, if speed controll is not required.
LT will be my choice, if speed controll is required (VFD)
Since HT VFDs are quiet high in cost.
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / sadam hussain gaad
Depends upon application.
if all other motors are operated on HT/LT then 300 KW motor
should be opertaed on HT/LT respectively.
If your generation is HT and you want operate on LT then
you have to install VCB, Transformer, ACB and size of cable
will be more as compared to HT but less insulation will be
required.
If you want to operate 300 KW on HT then no need of
transformer,ACB, only XLPE cable will be used.
| Is This Answer Correct ? | 1 Yes | 0 No |
Sir if i have 2kv ups in which 17ah 8 battries load 600watts how much back up time i get and if i put 6kv ups with the same no of battries same amp can i get more back up time please give reply exactly what is the procedure to calculate back up time for different kv,s
HOW DO I CALCULATE OVER LOAD RELAY & CONTACTOR IN DOL STARTER? & in dol why it is require circuit breaker?
what is different between phase and netural
At no load the PF of an alternator -Zero -Zero Lagging -Zero leading -None of the above
what happends when an isolater is operated on on-load
Why synchorised generators are used for the production of electricity?
Seamless tubes are made by?
what r Grid stations?what r there role.Explain in detail
What will be the full load current of 60KVA UPS. Suggest for this formula.
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
LT, CC and LMU installed at both the outgoing circuits of 132 kv double ckt transmissio what its means ? and what are there use ?
In scott connected transformer number of turns in the primary winding of teaser transformer is % of number of primary turns of main transformer A 86.6 B 57.7 C 14.4 D 33.3
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)