WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED
THAN ORDINARY BITUMINIOUS SURFACING?
Answer / ashok kumar
PMB stands for Polymer modified bitumen & used to cater bad
effect of water for bituminous roads
Is This Answer Correct ? | 4 Yes | 1 No |
how much binding wire is reqd for 1 MT
what is the use of dowels rod..?
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
Whether dry volume or wet volume of concrete more but why?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
How gate result to cube for 7 day? Formula for the cube testing?
1 Answers Ambuja, Indiabulls, Legacy,
How to find the requirement of cement and sand for the 1cum of rr masonry work
what is the hanekom repairing material after concreting work
How many types bend used in civil reinforcing
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What is kn measurement?
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.