Answer Posted / jagadeesh
1mm because total station only measures distances and slopes but not angles
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Which percentage of carpet area use in plot area of office building.
How many are the types of joints?
what is the anchorage length of reinforcement.
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
How to estabilish reinforcement Steel rolling margin for a building projects ?
can any one explain bar bending schedule of bems and columns and slabs ??
How much quantity water should be placed in one cubic meter area?
What are the uses of groynes?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
indian standard split spoon sampler