Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the least count of Total station

Answer Posted / kuldeep

1 second

Is This Answer Correct ?    28 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1934


Define What is unit weight of normal concrete?

1225


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1955


I have an span length 16 ft c/c

1408


Define different types of roof systems?

1152


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1521


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

2110


I need model question papers for writing the Dubai municipality exam,for G+1

10537


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

7751


what is cement wastage percentage in NHAI ROAD WORKS

1846


How to do rate analysis for concrete work including shuttering work?

1984


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2208


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

2005


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3033


Technical Question of Civil Engineering

2230