how you confirm the hard stratum for driven cat in situ
pile work?
Answers were Sorted based on User's Feedback
Answer / sachin pawar
to confirm the hard statum for driven cast in situ piles,
check the specific gravity of stone obtained while boring
the piles. it should be between 2.77 to 3.08
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sjtbehera
You may check the stone that takes boiler that driven in to
bores.
Is This Answer Correct ? | 3 Yes | 1 No |
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
Differentiate orthographic and isometric projections?
what is the grade of concrete?
bulkege of concrete for design mix concrete for grade m30
why you want more salary here then previous company???
How may digree of freedon in four bar chain.
15mm thick plastering 1:4 what is the cement consumption per sqm
Why should pumping be not used in case of concreting works?
Water absorption for stone?
What is an inverted beam??
How much overlaping required for welding the reinforcement bars in Columns & beams
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????