how you confirm the hard stratum for driven cat in situ
pile work?
Answer Posted / sachin pawar
to confirm the hard statum for driven cast in situ piles,
check the specific gravity of stone obtained while boring
the piles. it should be between 2.77 to 3.08
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is called Bulk Density of aggregate?
What is chemical composion test
Why do you want to work here
How do you determine specific gravity of cement?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
How much cement is require in one sqft area in a G+3 residential construction.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is structural frames or systems?
What is difference between engineering stress and true stress?
How do you compute volume of airflow?
For what purpose bedding is used under storm water drains, explain?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is pre-stressed concrete?
how to clculate the %of concrete strenght achive after curing?load
Define What is the distance between railway tracks?