how you confirm the hard stratum for driven cat in situ
pile work?
Answer Posted / sachin pawar
to confirm the hard statum for driven cast in situ piles,
check the specific gravity of stone obtained while boring
the piles. it should be between 2.77 to 3.08
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
Why should pumping be not used in case of concreting work?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Dear Sir What is the Contraction joint for base Slab
how much of the strength comes from post-production curing
How much cement is require in one sqft area in a G+3 residential construction.
what is tension footing?
why does the most of civil engg is not intersted to going for teaching field?
How to find CN by using arcgis 9.3?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
how to calculate the length diamond shaped striupps in column
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Wats the formula of eccentric footing and how was calculated from concrete qty
What you understand by building codes?