how you confirm the hard stratum for driven cat in situ
pile work?
Answer Posted / sjtbehera
You may check the stone that takes boiler that driven in to
bores.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Which is the direction for positive angle?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is meant by solid geometry?
What are the advantages and disadvantages of lead products in construction?
What is min thickness,min grade of conc & age of PQC ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what is the service corridor?
residential buildings,mixing of concrete,structural,construction material,site handling.
Sir how to find cutting length for footing steel bars in the shape of "u"
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
Define What are the reasons for geotechnical site investigations in Uganda?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work