Slab quantity
Answer / Manharan Singh Rajput
The slab quantity in a project can be calculated by multiplying the area of the slab by its thickness. The area can be found using the length, breadth and height (if the slab is reinforced), while the thickness is a design parameter.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is smart building materials?
Why use of fly ash in cement
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
Give me the name of type of slabs?
Define What is diversion tunnel in a dam?
can any one explain structural behaviour of trapezoidal combined footing?
Why are steel plates inserted inside bearings in elastomeric bearings?
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
How much sand for a 107sqm residensial building
1 Answers Shapoorji Pallonji Group(SPCL),
define silt?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
what is rigid pavement
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)