Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Hi All,

I am working as a Technical executive in a MNC company and
we have 1500KVA & 1250KVA T/F in our site, can you help me
that how many maintenance tests can be conducted and what
are the procedures included for the tests can you share
yours answers and also give any web address to get more
information on this

Answers were Sorted based on User's Feedback



Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / virendra joshi

Dear friend ,

Transformer is a heart of the electrical system & that is
the reason it required more care.

Daily :-

Check the Oil level in Conservator.
check for any leakage in transformer
Check for any abnormal sound
check for Colour of silica gel.
Check for any air in Bucholz realay , if found realease
with the air vent provided in the relay.

Yearly.

Check the Dielectrica strengh of oil , filter it & if
required replace it.

Check the earthing value of a Earthpit if required topup
with salt & water.

Check the tighness of the connection both the way Primaty
side & secondary side.

Clean the transformer yard throughly.

If required lay the granuals in the transformer yard.

By proper shut down manually check the tripping point of HT
breaker tripping set points like ( OT, WT & Bucholz Relay )

check the secondary side voltage as per desired voltage &
if any missallign found adjust with the tap changer.


please revert if any quarry exists.

Is This Answer Correct ?    3 Yes 0 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / tariq

in onload u cant do any test except temprature and sudden
pressur or oil level in conservator.oil leakage,cileco gel
colore for moisture,but in offload u can some more test
also.if u send ur question in detail may b i can help u

Is This Answer Correct ?    3 Yes 1 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / shivakumar.s

Which type of T/F ? Tell me first.

Is This Answer Correct ?    3 Yes 2 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / thyagarajan

checking of oil level in seal
reconditioning of silica gel
cleaning the bushing
check temp alarm
meger
check oil level in oltc, conservator

Is This Answer Correct ?    1 Yes 0 No

Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KV..

Answer / dr reddy's corporate offi

hai
1)take first permission from client & hod
2)switched off the brekers
3)rack out brekers applied loto kit
4)chek primary winding bushes & secondry winding bushes
5)chek silcazel colour(breather)
6)chek oil level & density of oil(resistance)
7)primary winding , secondary winding & core bolts retigtend
8)warnish apply winding
9)take break down votage test
10)chek oil teperature & winding temperaure guages functiong
11)chek oltc counter daily basis
12)trail tests taken buchloz realy

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

0 Answers  


in pf lagging means current decrease by increasing voltage is correct or not ? reason ?

3 Answers  


Do Phase angle measurement have any application in freq/harmonics measurement? If so how?

0 Answers  


what is the ckt diagram of a tubelight and is it the simplest ckt of electrical engineering and also the component?

0 Answers  


what is the function of choke in tube

1 Answers  


how do you calculate IKW(consumption per TR) in HVAC?

27 Answers   Aircon, CBRE, Cipla, Clivet, Cushman Wakefield, JLL, Sodexo, Voltas, Wipro,


What is thermal overload relay

2 Answers   Tech Mahindra,


WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.

0 Answers   L&T,


Whats the use of earth pits? and it will function? whats the natural earth value? How to improve ur earth resistance?

3 Answers   Anwar Ispat,


when we conduct high voltage testing why milli amp. is required?

2 Answers  


Is only insulation the difference between High voltage and Medium voltage cable?

1 Answers  


how much loading in terms of ampere can put on 5 MVA,33/11 KV TRANSFORMER having rated current 263 Amp ?????????

11 Answers   ABB,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)