Hi All,
I am working as a Technical executive in a MNC company and
we have 1500KVA & 1250KVA T/F in our site, can you help me
that how many maintenance tests can be conducted and what
are the procedures included for the tests can you share
yours answers and also give any web address to get more
information on this
Answers were Sorted based on User's Feedback
Dear friend ,
Transformer is a heart of the electrical system & that is
the reason it required more care.
Daily :-
Check the Oil level in Conservator.
check for any leakage in transformer
Check for any abnormal sound
check for Colour of silica gel.
Check for any air in Bucholz realay , if found realease
with the air vent provided in the relay.
Yearly.
Check the Dielectrica strengh of oil , filter it & if
required replace it.
Check the earthing value of a Earthpit if required topup
with salt & water.
Check the tighness of the connection both the way Primaty
side & secondary side.
Clean the transformer yard throughly.
If required lay the granuals in the transformer yard.
By proper shut down manually check the tripping point of HT
breaker tripping set points like ( OT, WT & Bucholz Relay )
check the secondary side voltage as per desired voltage &
if any missallign found adjust with the tap changer.
please revert if any quarry exists.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / tariq
in onload u cant do any test except temprature and sudden
pressur or oil level in conservator.oil leakage,cileco gel
colore for moisture,but in offload u can some more test
also.if u send ur question in detail may b i can help u
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / thyagarajan
checking of oil level in seal
reconditioning of silica gel
cleaning the bushing
check temp alarm
meger
check oil level in oltc, conservator
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / dr reddy's corporate offi
hai
1)take first permission from client & hod
2)switched off the brekers
3)rack out brekers applied loto kit
4)chek primary winding bushes & secondry winding bushes
5)chek silcazel colour(breather)
6)chek oil level & density of oil(resistance)
7)primary winding , secondary winding & core bolts retigtend
8)warnish apply winding
9)take break down votage test
10)chek oil teperature & winding temperaure guages functiong
11)chek oltc counter daily basis
12)trail tests taken buchloz realy
| Is This Answer Correct ? | 0 Yes | 0 No |
why we use 50hz frequency in india why not other frequencies like 52,59,42 etc
What is meant by analogous system?
Hi Friends pls give information regarding BARC written test. am attending by 20-5-2008. mail me to kkumarei@gmail.com or message to 9962122264
maintenance parameters of sewage treatment plant
In Panels Main Incomer considered should be TPN or FP?
What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?
what is bus PT ?
why the starting current of a motor is high?
What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?
What is miller crystal oscillator? Explain its operation?
Can we use generator transformer as step down transformer? How?
What is minimum phase system?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)