Hi All,
I am working as a Technical executive in a MNC company and
we have 1500KVA & 1250KVA T/F in our site, can you help me
that how many maintenance tests can be conducted and what
are the procedures included for the tests can you share
yours answers and also give any web address to get more
information on this
Answer Posted / dr reddy's corporate offi
hai
1)take first permission from client & hod
2)switched off the brekers
3)rack out brekers applied loto kit
4)chek primary winding bushes & secondry winding bushes
5)chek silcazel colour(breather)
6)chek oil level & density of oil(resistance)
7)primary winding , secondary winding & core bolts retigtend
8)warnish apply winding
9)take break down votage test
10)chek oil teperature & winding temperaure guages functiong
11)chek oltc counter daily basis
12)trail tests taken buchloz realy
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit
On a 3 winding transformer YNynd11, how do you apply REF protection to the Delta tertiary winding that is supplying auxiliaries to a substation?
What type of a DC motor would you use for a lift?
How to calculate energy stored in an inductance?
Draw a circuit diagram in which if button is open we can use socket and bulb as a series test circit and if button is close than simple we can use socket as any load purpose.
why to use freewheeling diode ( diode in revers bias mode) across dc coil
how to work droop ct in generating station
why are the maintaine power factor and how can this control and this is how work.
What should be the amps for a MV fuses for transformer 630kVA 20(10)/0.4 kV
11KV AND 22KV NETWORK KW CAPACITY IN RING AND RADIAL?
What is time response of the control system?
what is the most permissible winding temp when we conducting a generator load test?(condition no load)
Why auxiliary transformers are not connected in parallel in primary stations?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
why current is constant on d.c?