How to calculate the cable size (XLPE)for suitable to 120KW
load (if Motor or heaters etc)




Answers were Sorted based on User's Feedback



How to calculate the cable size (XLPE)for suitable to 120KW load (if Motor or heaters etc)..

Answer / prakashchandra rana

for 120kw motor flc is 180amp at .8 pf so if we run this motor
on star delta starter we will use two numbers of 150sq.mm
cable from starter to motor and its main power cable will be
of 300sq.mm.

Is This Answer Correct ?    3 Yes 1 No

How to calculate the cable size (XLPE)for suitable to 120KW load (if Motor or heaters etc)..

Answer / subhash t p

this load should conected with 3 phase
120*1000/440=273amps
we can use 300mm2xlpe cable.

Is This Answer Correct ?    9 Yes 8 No

How to calculate the cable size (XLPE)for suitable to 120KW load (if Motor or heaters etc)..

Answer / tanweer

Please send me the answer.

Thanks

Is This Answer Correct ?    1 Yes 0 No




How to calculate the cable size (XLPE)for suitable to 120KW load (if Motor or heaters etc)..

Answer / malleswr

for 120kw motor flc is 220A so cable size taken 1.5 times
to flc ie 330 300mm2 cable use

Is This Answer Correct ?    5 Yes 6 No

Post New Answer



More Electrical Engineering Interview Questions

Capacitor is load free component but why ampere meter shows current when capacitor bank breaker close?

0 Answers  


what is the difference between watts and volts?

2 Answers  


How to calculate the cable size in sq. mm. when the load is given in KW?

3 Answers  


How can we measure and monitor critical performance parameters of Diesel Generator Sets, both electrical and engine ?

3 Answers   Cologicx Systems,


how to protect transformer

2 Answers  






i need to connect fact device(any one from following upsc,sssc,svc,statcom and tcsc)in 14 bus system....by using MATLAB psat software....if i connect these fact devices,i will get some error as "virtual error"...i cnt rectify this error.if anybody know that how to work in psat,pls help me to rectify this error.... or send mail me to, viki0607@yahoo.co.in

1 Answers  


what is metering cum synchronizing panel and how it is used?

0 Answers   Wipro,


What is C curve and D curve of MCB?

3 Answers   GMR,


why weight is put on pulley?

1 Answers  


what is legal process of dg set?

0 Answers   Dutron Polymers,


Under Ground Power cable earthing is required at both end or single end? and reason for the same

3 Answers  


What is maximum power transfer theorem?

0 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (5066)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4436)
  • Electrical Engineering Interview Questions Electrical Engineering (16570)
  • Electronics Communications Interview Questions Electronics Communications (3914)
  • Chemical Engineering Interview Questions Chemical Engineering (1091)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (214)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (258)
  • Instrumentation Interview Questions Instrumentation (2983)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (96)
  • Marine Engineering Interview Questions Marine Engineering (122)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (0)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1376)