1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls
L&T,
8 34579At present which is the latest and best technology for waterproofing in India 1) Roof waterprofing, 2) Basement waterproofing and 3) Toilet waterproofing
4 9370How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
3 13206why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
L&T,
5 10946Post New Civil Engineering Questions
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
how to take concrete quantity for precast segment for viaduct project?
How to do base isolation for RC framed structure using ETABS software?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
which has high compressive strength between hollow block and brick masonry?
How do You Maintain a structure after getting cube test of low strength.
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Explain the water bound macadam roag
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Formula for calculation volume of essentric footing
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How is the strength of cement measured?
how can we construct building without foundation providing only grade beam at ground level