1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls
L&T,
8 34331At present which is the latest and best technology for waterproofing in India 1) Roof waterprofing, 2) Basement waterproofing and 3) Toilet waterproofing
4 9203How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
3 13060why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
L&T,
5 10766Post New Civil Engineering Questions
why is M30 grade Concrete use for Foothing & Column M50
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
why building got air crack? if it get in one particular are what is means?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
How to do bbs in excel format
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is the function of GSB all class ?
How can we convert weight batch to volume batch for m30 mix
difference between fc and fc'?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what are the code used for residental building?