why you have choosen civil engineering as a carrier ,what
goals do u have and how you wil aschiene it?
Answers were Sorted based on User's Feedback
Answer / dharmadas adhikary
May be I'm wrong, I know Civil Engineering is mother of all
Engineering branch, so I'm proud to be part of this one.
Is This Answer Correct ? | 10 Yes | 5 No |
Answer / kishlay
i didn`t have any other option when i took civil engineering as my major at B.I.T MESRA ,RANCHI. though over the past 3 years i explored the possibilities available in the field and this really makes me sad to say that this field lacks passionate individuals who can take the charge to build a new world . every now and then we hear about bridges collapsing and buildings falling , this clearly indicate that we lack skills .
and thus now i want to learn & apply skills to improve the way the world looks !!
Is This Answer Correct ? | 5 Yes | 2 No |
Answer / basit jogilkar
This my father's dream that's why I'm choosing this
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mayank jain
My interest in the field of infrastructure development. and
it have a more opportunity then other. if plan are good then
we get more success.
my goals 1 ka 2, 2ka4 ,4 ka 8,8ka
16,.........................................................
............................................................
............................................................
............................................................
............................................................
............................................................
............................................................
............................................................
............................................................
............................................................
............................................................
.......................................................
it is my aim and I will done It
so wait and see in future.
Is This Answer Correct ? | 8 Yes | 12 No |
how much volume is one bag cement of 50kg
15 Answers Portland, RJB, UltraTech,
how to prepare analysis of hire charges for 62.5 KVA generator
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
what is the quantity out-put by Hitachi-200 breaker for breaking or how to calculate
what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.
why cracks develop at the upper corners of doors openings
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
In Rcc ratio calculation I wanted to know quantity of Steel also.
Rate analysis of painting
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.