Is there any software to prepare the Estimate of building.Plz
tell me.......
Answers were Sorted based on User's Feedback
Answer / mayank jain
why we need any software ?
it is calculate on hand.(it need fast calculation,market
values and good experience).
| Is This Answer Correct ? | 17 Yes | 1 No |
Answer / gurunath khavanekar
there is not any special software for to prepare estimate
of building. this can be done in better way ie manually
with the help of M S Excel.
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / vicky
Yes there is one software of estimate named estimator 2.0
which you can easily download from internet.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sjtbehera
why you lie. it was not asked by L&T. Dnot be depend
software because you use software your knowledge getting
lower
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / prakash kedia
for estimation HIT OFFICE U CAN USE
THIS SOFTWARE HAS USED IN MY COLLEGE PUNE
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / suresh
one soft where is in the market.unfortunately i forget.plz
ask any cadd centre.
| Is This Answer Correct ? | 0 Yes | 7 No |
How to calculate compressive strength of concrete?
How to calculate 45 degrees bend Steel bar length in Slab Reinforce ment
12 Answers JBS Builders, L&T, Rajarathnam Construction,
what is the difference between compaction and consolidation?
what is diffreant between the english bond&flamish bond
Why we use pcc in foundation?
How is improve my knowledge in construction industries....
10mm aggregate 1brass = How many KG
1 Answers JMP, Rathore Group, Trishul Construction,
what is anchorage length,lap length and (dont remember the last one)
what is the difference between pumpable concrete and non pumpable concrete
how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)