Civil Engineering Interview Questions
Questions Answers Views Company eMail

Why did you choose this career?

3 6947

I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.

5 8624

what is specific gravity of soil?

9 11407




what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?

Dimension Data,

6 31262

how to doing or how to prepare the or which things can be done on the site when construct the building?

1 2837

in the construction of building,we are use formula for laping? such that how many formulae we use? which are them?

6 7135

how to create our resume?

Sunraj Construction,

865

what is mcArther pile?

Kerala Public Service Commission,

1417




which type of foundation is used for seismic prone area?

Kerala Public Service Commission, CCB,

9 9959

HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.

CCCL, PSCI,

1 3807

convert= kg into brass

8 78796

standered size of toilet & bath?also stair-case?

2 4312

how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?

Ajnara Group,

1323

which one is economical construction brick masonry or sold block masonry?

3 4077

What is the the difference between piller base and wall base ? give cost difference ?

L&T, DLF,

1 5168


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

what is the use of water bar in water tank and is this an extra item in estimate?

1233


door and window wood work calculations and different methods

932


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

2727


How do you calculate load bearing capacity of a waffle slab?

1329


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

556






how to caluclate sienerge qty in construction in ap

1121


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

1116


what is grade intersection?

863


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1087


silt%= silt volume/ silt+sand volume is this right?

722


What is type failure of road surface? how to repair the failure of road surface?

1163


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

824


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

833


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

464


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

947