Civil Engineering Interview Questions
Questions Answers Views Company eMail

residential buildings,mixing of concrete,structural,construction material,site handling.

Saudi Aramco Shell Refinery Company SASREF,

1135

residential projects,structural.

Saudi Aramco Shell Refinery Company SASREF, Ambuja, KBR,

1599

what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35

3 4600




how many quantity of water use in 1cu.m. concrete

Jaypee,

4 8904

. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1125

what is stub column ?

UltraTech, Gammon,

6 60955

What is the diffrence between FE 415 & FE 500 TMT BARS

Sail, Gammon,

7 24450





what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?

5 6256

How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??

3 9241

Which IS Codes used for the steel reinforcement work?

12 17250

why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?

Gammon,

5 11328

what is the bend correction for 90 degree of bend in any dia of HYSD steel reinforcement as per IS code ?

HFL,

3 10428

please tell me how to convert cubic feet to cubic meter

5 24371

deshuttering time for RCC wall & column

13 9397


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

1127


about higyway engineering

2157


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

819


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

916


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

602






what is the dimensions of river sand truck trailer or trolly ?

2416


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

809


what is work of planning deptt. in any construction compny (in road project)

1020


How to fix toll charge for a particular vehicle at toll booths in a highway?

609


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

978


Why should you consider yourself fit to be hired by jindal steel.

2444


a butt weld is specified by

934


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

4426


When column of building is abutting the boundary line,then suitable footing advised is

267


How do You Maintain a structure after getting cube test of low strength.

1012