Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is the quantity of cement,sand and aggregate in 600*600*1600 mm in 1:4:8

L&T, RPG,

8 6254

What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

Apex,

1132

what is inspection?

1 4717




pointing raju,ayesha says"he is the son of my mother's brother's wife". how is ayesha related to raju?

7 3621

what is difference between active and passive earth pressure. how it effect the retaining wall design ?

4 29312

how to calculate the wind pressure

1 4228

What is the significance of Hook's in stirrups.

L&T,

6 13654

What is specific gravity & how it is calculated

2 3949




Technical Question of Civil Engineering

L&T, DLF, NBCC, Mrkr Constructions, Era Infra Engineering,

1042

wat is diff. between rectangle & parallelogram?

4 3485

What is the diff. Between rectangle & parallelogram?

10 22848

how to calculate the 45 degree bent up length. if we given that whether the total length of the slab reinforcement will increase or not. mantion it clearly please. this is for bar bending schedule purpose?

Indian Army, L&T,

4 7909

how can we find out the ratio of cement and sand in plastering

2 4349

by which IS Code bend correction is two times of the dia meter of steel is taken

3 5902

what is temp. control concrete and what use of it ?

1 3514


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

699


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

975


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

565


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

726


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

981






How to arrive dry volume of concrete (1.52 to 1.57) ?

661


please send me bhel questions on rupesh.017@rediffmail.com

1408


How to do bbs in excel format

454


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

992


How to do rate analysis for concrete work including shuttering work?

581


how to calculate weight of 1.8 cum of aggregate

426


How can i do RCC rate analysis?

410


Form where IS456 is adopted in 1978?

493


how much required strength of cement concrete bricks(size 230x115x75mm)

589


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

198