Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) what will be the difference in compressive test results for a 150 mm cube, a 150 mm cylinder and a 300 mm cube
5 13152how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????
1 2919does the Trivector Meter of three phase automatically takes care of the low power factor and gives the reading accordigly or it does not take care of the Power factor while giving the readings please explain
1 2002What effect of supplying stationary generator (800kVA) with 415V AC from 1500kVA transformer?
2 4749I am from B.Tech back ground, i had Applied to do masters in Engineering management, and university gave Admission and sent I-20, if the interviewer asks why are doing masters in this field, even you are from B.Tech (information technology)? Can any one give me relevant answer, if interviewer asks that question
1 2120i have studied my Btech up to 5years, is any problem with duration of the year.if the us embassy interviewer ask me why you have got 5 years to complete your btech,can you please give me answer.And i got less percentage.
1 4011What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
NFL,
1 2141
Hello sir I am going to give section engineer examination and will be held in 2010. So I need all prevous years examination papers. please send it on my email id : bhalchandrap@yahoo.co.in
plz anyone provide me the sample test papers of ONGC as of i m from Mechanical engg bakground and would be appearing for the test in the june 2010. My email id - neeraj_94312@rediffmail.com
Anyone answer what is average cost for 1 meter GI pipe Hot dipping
Any body know when the medicals are starting for the BSI P.O , if anybody got any call letter please let me know
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
pleas send me the syllabus of rrb je examination(mechanical)
which is the syllabus of the ongc next month exam pls send me on my mail id..
Technical Question of Civil Engineering
Which type of question u have asked to the fresher
Please send me RRB Bhopal last 5 years solved Question paper on amrita_jain2001@yahoo.com
I have applied for the post of Section Engineer. plz anyone send me the previous question paper. i did my engineering in Information Technology.
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
i am preparing for aai atc ? plz can u send me som emodel qus?
what is the difference between replacement of cement by groundnut shell ash
Electrical Engineering