Hello friends., my question is related to testing of current transformer... A Ct having knee point voltage of 750 volts., and I have two step up transformer's of rating 230 v to 440 volts., can I obtain the value of 750 volts by using the two transformer's.... If yes then how could I connect the transformer's to obtain knee point voltage?? thank you in advance
ABB,
1 4017please anyone suggest me some good intools training institutes with their place and contact nos.
1 3450what is the basic steps for designing an ups,inverters, and battery connections for series and parrallel connections in ups
1746why are the likely reasons for bochholz & pressure relays oprate due to a internal fault but not differential relay ?
2 3603
what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?
Earth is a conductor or load?then ammeter connect to 3- phase supply,it shows the measurents or not?
what happens to delay if we include a resistance at the output of a cmos circuit.expalin it clearly
direction of tarbine& genrator
What is viscosity and why is it important?
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor
Oil and fat containing food items are flushed with nitrogen. Why?
send me tech quesions please to 470.rajesh@gmail.com
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
WHAT IS SHORT CIRCUIT STRENGTH OF 100 AMPS MCCB?
What are the materials available to prepare individually for competetive exams in Instrumentation field? Plz reply...
If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.
explain the advantages of power factor correction is an RLC circuit for a commercial customer, include tarifs..
types of survey and levelling instrument ?
how you taken aotitude test