how we can estimate the M50 concrete for foundation?
Answers were Sorted based on User's Feedback
Answer / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
Is This Answer Correct ? | 0 Yes | 3 No |
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is mean by grade of steel?if Fe 415,Fe500- what is this 500 and 415 denotes?
what is the best method for analysing frames of multistoreyed structures
What is Architect-Prepared Contract?
which type of foundation is used for seismic prone area?
9 Answers CCB, Kerala Public Service Commission,
How to calculate the amount of Brick,cement & sand required for 1 cum of 115mm thick brick work with ratio 1:5 please give me an answer with detailed step
Deduction in length of reinforcement steel for bar bending
how much one carpenter can doing shuttering of slab in one day
how to calculate the wind pressure
3. What are the disadvantages of your present job, things you do not like about it?
What is the percentage of wastage in steel reinforcement n how to control it?