Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how we can estimate the M50 concrete for foundation?

Answers were Sorted based on User's Feedback



how we can estimate the M50 concrete for foundation?..

Answer / veer singh

you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate

S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)

Is This Answer Correct ?    0 Yes 0 No

how we can estimate the M50 concrete for foundation?..

Answer / satya

quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

how much brick,cement,and sand required in 1cum brickwork(1:4)

8 Answers   JMC, RK,


How to calculate the Water cement ratio of reqiured compressive Strength of concrete?

11 Answers  


how to calculate rate analysis of M25 grade concrete

8 Answers   Nagarjuna Construction, Simplex,


What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?

15 Answers  


How many layers in 12mm and 18mm plywood?

6 Answers   JMC Projects, L&T,


Why alternate bars are given bent-up in slab and how to decide the length of bent up?

5 Answers  


For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is

1 Answers  


What is proportion of PCC Grade G?

0 Answers  


How to do rate analysis for concrete work including shuttering work?

0 Answers   DBM, Techno Solutions,


The difference between Centering & Shuttering is –––

6 Answers   UIPL,


# 1. Water observation capacity (MAximum)of Solid bricks # 2. Minimum Crushing Strength of Solid Blocks.

4 Answers   Brigade,


what is the meaning for 'prime cost' in civil construction contracts?

3 Answers   EPPPL, Nagarjuna Construction,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)