For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
Answer / bugti.ghalib@yahoo.com
V=100*0.012 = 1.2 cum
in plaster volume increases by 33% then
dry volume = 1.2*1.33 = 1.596 cum
Cement = 1.596*(1/7)*1440 = 328.32 kg
hint: 1440 kg/m3 is the density of cement, 1 is the ratio of cement and 7 is the total sum of ratios
No. of bags = 328.32/50 = 6.56 bags ie.one bag of cement= 50 kg
sand = 1.596*(6/7)*35.28 = 48.26 cft ie. 35.28 = (3.28)3
Is This Answer Correct ? | 3 Yes | 1 No |
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
0 Answers L&T, Rail Vikas Nigam Limited RVNL, RRB,
acceptance criteria for concrete works
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
HOw to find the depth of foundation?
CROSS SLOPE OF Macadam Construction
How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?
0 Answers First MicroFinance Bank FMFB,
What are the grade of steel used in the concrete design.?
8 Answers Engineers India Limited,
Which is code is used for measurmenr of reinforcement steel work.
I want to join bhel because
what is mean by tie beam?where it is used?
reinforcement lapping for short pile and long pile
WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING