Why alternate bars are given bent-up in slab and how to
decide the length of bent up?
Answers were Sorted based on User's Feedback
Answer / v.prudhvi raju
for controlling negative bending moment in slab,we should
provide bars at top corners of the slab,by providing bent up
bars we are controlling negative bending moment and shear
also...(shear is acting in diagnolly)
| Is This Answer Correct ? | 44 Yes | 5 No |
Answer / santosh singh
because it is economical and there is good anchorage.
length of bent up is L/4 OR L/5
| Is This Answer Correct ? | 27 Yes | 10 No |
Answer / syed shujauddin
Due to partial fixity at support position of a beam/slab section, a negative BM occurs at the end position , and it means tensile side is now at upper portion of the section and compressive side at the bottom portion, i:e: a hogging moment forms, and as we know that concrete is more safe at comp. side than tension, so we provide bent up bars at the upper most part of it to resist that amount of negative BM.
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / muskan
The bent up is at L/7 distance
But in case the of a continuous slab, the bent up is at L/5.
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate the number of bricks for 10'x10' wall?
plz.show development and anchorage length in simple diagram.
How much area can plaster with one bag of cement?what is the size of the fuji blocks?
What is the strength of concrete with ratio 1:4:8 as per British standard or ACI
How much concreat we make by 1 bag cement? (ratio- 1:1.5:3 or 1:2:4)
2 Answers Castles Consulting Engineers, KCP, Opaque Infrastructure,
Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com
hi... how to find reaction in continous beam 4 different span ?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
What out turn civil works
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
What will be the maximum length of RCC Lintels?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)