how we can estimate the M50 concrete for foundation?
Answer Posted / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate the load of partion in flat slab if we use brick?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how to shuttering is used in slab
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
questions with answers to face an interview of an civil engineer regarding RCC buidings
Why do you want to work here
Difference between lime, distemper and plastic emulsion?
what is parametre for M25 after 7 days strength
how we can find sieve #4 is 4.75mm?
Which are the top apps for you civil engineer?
what is the mode of method of face bar measurement
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Which type of plywood & sizes using in construction projects ?
What is the force exerted by the tacoma narrows bridge?