how we can estimate the M50 concrete for foundation?
Answer Posted / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is rolling stock
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What are your goals?
What is thumb rule in quantity and cost estimation of a residential building?
may i know the detailed description of cutting length
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
How much is the cover for slab?
why is M30 grade Concrete use for Foothing & Column M50
Explain the difference between shear and tensile strength.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
how much to get of BRC lapping in full yield and half yield ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What are the joints wants to made in masonry where door opening, arches like etc..
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.