how we can estimate the M50 concrete for foundation?

Answer Posted / veer singh

you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate

S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is rolling stock

1894


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1593


What are your goals?

2120


What is thumb rule in quantity and cost estimation of a residential building?

2650


may i know the detailed description of cutting length

1641






hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1072


How much is the cover for slab?

740


why is M30 grade Concrete use for Foothing & Column M50

2989


Explain the difference between shear and tensile strength.

665


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

1946


how much to get of BRC lapping in full yield and half yield ?

1981


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1564


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1767


What are the joints wants to made in masonry where door opening, arches like etc..

1287


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1954